Coca-Cola Kwanza filler line recovery
Excess foaming during filling led to underfilled bottles and downstream interruptions at the Dar es Salaam plant.

What we did
Fixed the unequal vent tubes, replaced the worn discharge star wheel, and calibrated the CO₂ supply.
Result
Filler now runs at 95% OEE
Project profile
- Industry
- Beverage
- Country
- Tanzania
- Outcome
- Filler now runs at 95% OEE
Related projects
Beverage · Tanzania
Tanzania Breweries inspection uptime
Stoppages from a communication fault and blurred inspection glass were causing false rejections on the empty-bottle inspector.
View case studyBeverage · Tanzania
Coca-Cola Beverages Africa plant maintenance
A bottling plant needed a full audit, critical spares, and dependable upkeep of its safety systems.